Which two storage policy changes require a full rebuild of all components for an object? (Choose two.)
An architect has been asked to plan the impact of a storage policy change to one of the production All-Flash based vSAN datastores. The change will reduce the failures to tolerate value from 2 to 1 for objects with a RAID-1 (Mirroring) layout in the existing policy. This change will be applied to multiple VMs.
Which statement is correct in this scenario?
Which storage policy can be assigned to virtual machines in a 5-node, all flash vSAN cluster, to provide the highest level of redundancy?
An administrator observes this health check warning:
Controller firmware is VMware certified
They proceed to update the latest firmware on the Storage Controller. After a successful firmware upgrade, the same health check alert continues to display.
Which statement is true?
Which is true of the vSAN iSCSI target service?
A vSAN administrator wants to implement end-to-end prioritization of vSAN traffic across the network in a shared network infrastructure that is using vSphere
Distributed Switches (VDS).
Which two can help achieve this objective? (Choose two.)
A vSAN administrator is working on a 4 host homogenous vSAN Cluster that has 2 disk groups per host. One of the hosts needs to be permanently removed and repurposed for some other use.
These are the out of order steps which need to be completed:
Refer to the exhibit.
Refer to the exhibit.
Create a free account to unlock all questions for this exam.
Log In / Sign UpReference the exhibit.
A university campus has a site topology illustrated in the exhibit. Adjacent connected buildings are connected with a single 40gb layer 3 network with a RTT of
0.6ms as depicted by each line. An architect wants to configure a fault domain in each building.
What would the architect need change in order to implement a fully supported vSAN Cluster?
Which two statements regarding networking are true for a vSAN Stretched Cluster? (Choose two.)
A vSAN Cluster stretched across Data Site 1 and Data Site 2 has a vSAN data network configured with an MTU of 9000. The witness node has been placed in a remote site across a WAN with an MTU of 1500. The vSAN health check, 'vSAN: MTU check (ping with large packet size)', reports a failed ping.
What two actions could resolve the issue? (Choose two.)
An administrator is managing a 4-node, hybrid vSAN cluster. One of the hosts in the cluster went offline.
Referencing the information displayed in the resyncing objects section of the vSAN UI, what is the current state of this cluster?