Question 26
DRAG DROP -
A company is developing a Microsoft Dataverse plug-in.
The plug-in must create a follow-up task for a new account.
You add the code that receives context(IPluginExecutionContext) and service(IOrganizationService).
You need to create the remaining code to insert the follow-up task.
Which three code blocks should you use in sequence? To answer, move the appropriate code sequences from the list of sequences to the answer area and arrange in the correct order.
Question 27
Note: This question is part of a series of questions that present the same scenario. Each question in the series contains a unique solution. Determine whether the solution meets the stated goals. Some question sets might have more than once correct solution, while others might not have a correct solution.
After you answer a question in this section, you will NOT be able to return to it. As a result, these questions will not appear in the review screen.
A company designs data integration with an external system by using virtual tables.
You need to implement the virtual tables.
Solution: Create a calculated column on the virtual table.
Does the solution meet the goal?
- A: Yes
- B: No
Question 28
A company designs a Microsoft Dataverse Custom API to encapsulate business logic in it.
The Custom API business logic must be encapsulated in a way that does not allow the business logic behavior to be modified or canceled.
You need to set the parameter value of the custom API so it cannot be customized.
Which parameter value should you set?
- A: Execute Privilege Name to prv_SdkMessageProcessingStep
- B: Enabled for Workflow to No
- C: Binding Type to Entity
- D: Custom Processing Step to None
Question 29
A company has a model-driven app form. Many users use the form.
Users state that the form takes too long to fully load.
You need to evaluate the form design to improve loading performance.
Which three control types can you use? Each correct answer presents a complete solution.
NOTE: Each correct selection is worth one point.
- A: timeline
- B: quick view form
- C: iFrame
- D: lookup
Question 30
DRAG DROP
Case study
This is a case study. Case studies are not timed separately. You can use as much exam time as you would like to complete each case. However, there may be additional case studies and sections on this exam. You must manage your time to ensure that you are able to complete all questions included on this exam in the time provided.
To answer the questions included in a case study, you will need to reference information that is provided in the case study. Case studies might contain exhibits and other resources that provide more information about the scenario that is described in the case study. Each question is independent of the other questions in this case study.
At the end of this case study, a review screen will appear. This screen allows you to review your answers and to make changes before you move to the next section of the exam. After you begin a new section, you cannot return to this section.
To start the case study
To display the first question in this case study, click the Next button. Use the buttons in the left pane to explore the content of the case study before you answer the questions. Clicking these buttons displays information such as business requirements, existing environment, and problem statements. If the case study has an All Information tab, note that the information displayed is identical to the information displayed on the subsequent tabs. When you are ready to answer a question, click the Question button to return to the question.
Background
City Power & Light is an energy and utilities company that has offices in Europe. The company subsidizes home improvements for domestic customers, to improve energy efficiency and to meet environmental commitments. The company also distributes and generates electricity for domestic and commercial customers. The company has 2,000 employees in multiple offices and in work-from-home locations.
City Power & Light uses a team of schedulers, assessors, field engineers, and customer support agents for home improvements in a program named Get Energy Fit.
Current Environment
Get Energy Fit Program
City Power & Light uses the following to manage the Get Energy Fit program:
• The company uses a Microsoft Excel spreadsheet named Planning Hub on Microsoft SharePoint Online to store information about customer appointments, customer details, and customer eligibility in the program.
• The company records sensitive customer information that includes the document identification numbers and the customer's financial information.
• The company uses an assessor to verify customer eligibility in the program and to perform a suitability assessment. The assessor completes the suitability assessment by using a paper and clipboard at the customer property and enters the data to the Planning Hub after the assessment is completed. The assessor also uploads photographs to an on-premises document library. The assessor completes the eligibility assessment by using an application written in React.
• Schedulers use Microsoft Outlook to schedule engineers and assessors for home improvement appointments. About 200 appointments are scheduled daily.
• Employees for the company submit funding claims on behalf of the customer by uploading evidence and compliance checks information to an application named the Claim Submission Portal.
Technical Environment
• Schedulers use Windows 11 desktop and laptop computers with the latest version of Microsoft Edge.
• Assessors use iOS and Android tablet devices.
• The Claim Submission Portal uses REST-based APIs for all operations and a dedicated testing environment. Authentication to the API is provided by using the following example header key and value pair:
o Authentication: 2C8D41431415E429C7FC7A74D8315
• The company uses Microsoft Azure for hosting multiple applications.
Requirements
Overview
City Power & Light plans to implement Microsoft Power Platform to improve the customer experience and increase delivery for the Get Energy Fit program.
Business Requirements
• Only team leaders and senior managers should have access to read personally identifiable information (PII).
• All development changes must be tested in a separate environment.
• The company requires out-of-the-box solutions, when possible.
• Sensitive credentials, such as user passwords and API secrets, must be stored securely.
• The Claim Submission Portal must allow citizen developers to create automated solutions.
• Customer and appointment information must be accessible to all applications.
Planning Hub Application
The company is planning to replace the Planning Hub spreadsheet with a new application. The new application has the following requirements:
• The application must support a component design that provides rapid changes requested by the schedulers.
• The data model for the application must capture the following information:
o Information about customers such as name, address, and other PII.
o The data and time for an assessor's or engineer's appointment. Schedulers must be able to view all appointments without filters.
o Records the details of the home improvements installed for the customer.
o Contains all the information and evidence for submission to the Claim Submission Portal.
• After an assessor uploads the funding application and all evidence after a home improvement has been complete, the company requires that the status of the application is set to Submit and should run the following:
o Retrieve the details about the customer and the improvement installed.
o Send an approval to a senior manager to review and approve in Microsoft Teams.
o Upload the information to the API endpoint.
o If the upload fails to complete, it should retry after a delay of 30 seconds up to three times. If an error occurs after three times, the application should send an email notification to the application support team.
o Must record the status on the funding application.
Suitability Assessment Tool
The company plans to implement a new application named the Suitability Assessment Tool for the assessors. The new application has the following requirements:
• Must integrate with Microsoft Power Platform.
• Assessors must be able to complete the eligibility assessment by using the Suitability Assessment Tool. The assessors must be able to upload photographs to the on-premises file share.
• Must be developed by using modular components that can be used by other applications.
• Must be optimized for use on tablet devices.
• All changes to the application must be completed in the Suitability Assessment Tool solution.
Reporting
The company has the following requirements for a reporting solution:
• The data source for the reporting solution must support incremental refreshes.
• The solution must report accurate data if an error occurs.
Issues
• A recent audit identified that all users can access the PII in the Planning Hub spreadsheet.
• After a developer deploys a change to the production environment, a user reports information is loaded incorrectly to the test system when processing a funding application.
• After deploying a change to the new eligibility assessment tool in the development environment, you observe that the changes do not appear in the development environment.
• After removing a column from the Planning Hub application and deploying the changes to the production environment, you observe that the column is still present.
• You deploy the customizations for the data model. Users report that the email address of the user who created the appointment is missing and that searches on the description information do not return any results.
You need to design the Planning Hub data model.
Which four actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.
Question 31
Case study -
This is a case study. Case studies are not timed separately. You can use as much exam time as you would like to complete each case. However, there may be additional case studies and sections on this exam. You must manage your time to ensure that you are able to complete all questions included on this exam in the time provided.
To answer the questions included in a case study, you will need to reference information that is provided in the case study. Case studies might contain exhibits and other resources that provide more information about the scenario that is described in the case study. Each question is independent of the other questions in this case study.
At the end of this case study, a review screen will appear. This screen allows you to review your answers and to make changes before you move to the next section of the exam. After you begin a new section, you cannot return to this section.
To start the case study -
To display the first question in this case study, click the Next button. Use the buttons in the left pane to explore the content of the case study before you answer the questions. Clicking these buttons displays information such as business requirements, existing environment, and problem statements. If the case study has an All Information tab, note that the information displayed is identical to the information displayed on the subsequent tabs. When you are ready to answer a question, click the Question button to return to the question.
Background -
City Power & Light is an energy and utilities company that has offices in Europe. The company subsidizes home improvements for domestic customers, to improve energy efficiency and to meet environmental commitments. The company also distributes and generates electricity for domestic and commercial customers. The company has 2,000 employees in multiple offices and in work-from-home locations.
City Power & Light uses a team of schedulers, assessors, field engineers, and customer support agents for home improvements in a program named Get Energy Fit.
Current Environment -
Get Energy Fit Program -
City Power & Light uses the following to manage the Get Energy Fit program:
• The company uses a Microsoft Excel spreadsheet named Planning Hub on Microsoft SharePoint Online to store information about customer appointments, customer details, and customer eligibility in the program.
• The company records sensitive customer information that includes the document identification numbers and the customer's financial information.
• The company uses an assessor to verify customer eligibility in the program and to perform a suitability assessment. The assessor completes the suitability assessment by using a paper and clipboard at the customer property and enters the data to the Planning Hub after the assessment is completed. The assessor also uploads photographs to an on-premises document library. The assessor completes the eligibility assessment by using an application written in React.
• Schedulers use Microsoft Outlook to schedule engineers and assessors for home improvement appointments. About 200 appointments are scheduled daily.
• Employees for the company submit funding claims on behalf of the customer by uploading evidence and compliance checks information to an application named the Claim Submission Portal.
Technical Environment -
• Schedulers use Windows 11 desktop and laptop computers with the latest version of Microsoft Edge.
• Assessors use iOS and Android tablet devices.
• The Claim Submission Portal uses REST-based APIs for all operations and a dedicated testing environment. Authentication to the API is provided by using the following example header key and value pair: o Authentication: 2C8D41431415E429C7FC7A74D8315
• The company uses Microsoft Azure for hosting multiple applications.
Requirements -
Overview -
City Power & Light plans to implement Microsoft Power Platform to improve the customer experience and increase delivery for the Get Energy Fit program.
Business Requirements -
• Only team leaders and senior managers should have access to read personally identifiable information (PII).
• All development changes must be tested in a separate environment.
• The company requires out-of-the-box solutions, when possible.
• Sensitive credentials, such as user passwords and API secrets, must be stored securely.
• The Claim Submission Portal must allow citizen developers to create automated solutions.
• Customer and appointment information must be accessible to all applications.
Planning Hub Application -
The company is planning to replace the Planning Hub spreadsheet with a new application. The new application has the following requirements:
• The application must support a component design that provides rapid changes requested by the schedulers.
• The data model for the application must capture the following information:
o Information about customers such as name, address, and other PII. o The data and time for an assessor's or engineer's appointment. Schedulers must be able to view all appointments without filters. o Records the details of the home improvements installed for the customer. o Contains all the information and evidence for submission to the Claim Submission Portal.
• After an assessor uploads the funding application and all evidence after a home improvement has been complete, the company requires that the status of the application is set to Submit and should run the following:
o Retrieve the details about the customer and the improvement installed. o Send an approval to a senior manager to review and approve in Microsoft Teams. o Upload the information to the API endpoint. o If the upload fails to complete, it should retry after a delay of 30 seconds up to three times. If an error occurs after three times, the application should send an email notification to the application support team. o Must record the status on the funding application.
Suitability Assessment Tool -
The company plans to implement a new application named the Suitability Assessment Tool for the assessors. The new application has the following requirements:
• Must integrate with Microsoft Power Platform.
• Assessors must be able to complete the eligibility assessment by using the Suitability Assessment Tool. The assessors must be able to upload photographs to the on-premises file share.
• Must be developed by using modular components that can be used by other applications.
• Must be optimized for use on tablet devices.
• All changes to the application must be completed in the Suitability Assessment Tool solution.
Reporting -
The company has the following requirements for a reporting solution:
• The data source for the reporting solution must support incremental refreshes.
• The solution must report accurate data if an error occurs.
Issues -
• A recent audit identified that all users can access the PII in the Planning Hub spreadsheet.
• After a developer deploys a change to the production environment, a user reports information is loaded incorrectly to the test system when processing a funding application.
• After deploying a change to the new eligibility assessment tool in the development environment, you observe that the changes do not appear in the development environment.
• After removing a column from the Planning Hub application and deploying the changes to the production environment, you observe that the column is still present.
• You deploy the customizations for the data model. Users report that the email address of the user who created the appointment is missing and that searches on the description information do not return any results.
You need to implement the Suitability Assessment Tool.
What should you use?
- A: Power App Component Framework (PCF) control
- B: view
- C: component library
- D: form
Question 32
Case study -
This is a case study. Case studies are not timed separately. You can use as much exam time as you would like to complete each case. However, there may be additional case studies and sections on this exam. You must manage your time to ensure that you are able to complete all questions included on this exam in the time provided.
To answer the questions included in a case study, you will need to reference information that is provided in the case study. Case studies might contain exhibits and other resources that provide more information about the scenario that is described in the case study. Each question is independent of the other questions in this case study.
At the end of this case study, a review screen will appear. This screen allows you to review your answers and to make changes before you move to the next section of the exam. After you begin a new section, you cannot return to this section.
To start the case study -
To display the first question in this case study, click the Next button. Use the buttons in the left pane to explore the content of the case study before you answer the questions. Clicking these buttons displays information such as business requirements, existing environment, and problem statements. If the case study has an All Information tab, note that the information displayed is identical to the information displayed on the subsequent tabs. When you are ready to answer a question, click the Question button to return to the question.
Background -
City Power & Light is an energy and utilities company that has offices in Europe. The company subsidizes home improvements for domestic customers, to improve energy efficiency and to meet environmental commitments. The company also distributes and generates electricity for domestic and commercial customers. The company has 2,000 employees in multiple offices and in work-from-home locations.
City Power & Light uses a team of schedulers, assessors, field engineers, and customer support agents for home improvements in a program named Get Energy Fit.
Current Environment -
Get Energy Fit Program -
City Power & Light uses the following to manage the Get Energy Fit program:
• The company uses a Microsoft Excel spreadsheet named Planning Hub on Microsoft SharePoint Online to store information about customer appointments, customer details, and customer eligibility in the program.
• The company records sensitive customer information that includes the document identification numbers and the customer's financial information.
• The company uses an assessor to verify customer eligibility in the program and to perform a suitability assessment. The assessor completes the suitability assessment by using a paper and clipboard at the customer property and enters the data to the Planning Hub after the assessment is completed. The assessor also uploads photographs to an on-premises document library. The assessor completes the eligibility assessment by using an application written in React.
• Schedulers use Microsoft Outlook to schedule engineers and assessors for home improvement appointments. About 200 appointments are scheduled daily.
• Employees for the company submit funding claims on behalf of the customer by uploading evidence and compliance checks information to an application named the Claim Submission Portal.
Technical Environment -
• Schedulers use Windows 11 desktop and laptop computers with the latest version of Microsoft Edge.
• Assessors use iOS and Android tablet devices.
• The Claim Submission Portal uses REST-based APIs for all operations and a dedicated testing environment. Authentication to the API is provided by using the following example header key and value pair: o Authentication: 2C8D41431415E429C7FC7A74D8315
• The company uses Microsoft Azure for hosting multiple applications.
Requirements -
Overview -
City Power & Light plans to implement Microsoft Power Platform to improve the customer experience and increase delivery for the Get Energy Fit program.
Business Requirements -
• Only team leaders and senior managers should have access to read personally identifiable information (PII).
• All development changes must be tested in a separate environment.
• The company requires out-of-the-box solutions, when possible.
• Sensitive credentials, such as user passwords and API secrets, must be stored securely.
• The Claim Submission Portal must allow citizen developers to create automated solutions.
• Customer and appointment information must be accessible to all applications.
Planning Hub Application -
The company is planning to replace the Planning Hub spreadsheet with a new application. The new application has the following requirements:
• The application must support a component design that provides rapid changes requested by the schedulers.
• The data model for the application must capture the following information:
o Information about customers such as name, address, and other PII. o The data and time for an assessor's or engineer's appointment. Schedulers must be able to view all appointments without filters. o Records the details of the home improvements installed for the customer. o Contains all the information and evidence for submission to the Claim Submission Portal.
• After an assessor uploads the funding application and all evidence after a home improvement has been complete, the company requires that the status of the application is set to Submit and should run the following:
o Retrieve the details about the customer and the improvement installed. o Send an approval to a senior manager to review and approve in Microsoft Teams. o Upload the information to the API endpoint. o If the upload fails to complete, it should retry after a delay of 30 seconds up to three times. If an error occurs after three times, the application should send an email notification to the application support team. o Must record the status on the funding application.
Suitability Assessment Tool -
The company plans to implement a new application named the Suitability Assessment Tool for the assessors. The new application has the following requirements:
• Must integrate with Microsoft Power Platform.
• Assessors must be able to complete the eligibility assessment by using the Suitability Assessment Tool. The assessors must be able to upload photographs to the on-premises file share.
• Must be developed by using modular components that can be used by other applications.
• Must be optimized for use on tablet devices.
• All changes to the application must be completed in the Suitability Assessment Tool solution.
Reporting -
The company has the following requirements for a reporting solution:
• The data source for the reporting solution must support incremental refreshes.
• The solution must report accurate data if an error occurs.
Issues -
• A recent audit identified that all users can access the PII in the Planning Hub spreadsheet.
• After a developer deploys a change to the production environment, a user reports information is loaded incorrectly to the test system when processing a funding application.
• After deploying a change to the new eligibility assessment tool in the development environment, you observe that the changes do not appear in the development environment.
• After removing a column from the Planning Hub application and deploying the changes to the production environment, you observe that the column is still present.
• You deploy the customizations for the data model. Users report that the email address of the user who created the appointment is missing and that searches on the description information do not return any results.
You need to identify the Azure service to use for the Planning Hub application.
Which service should you use?
- A: Logic App
- B: Service Bus
- C: Key Vault
- D: Function
Question 33
DRAG DROP
A company is implementing business logic in a model-driven app. Employees import records from Microsoft Excel to create lead records.
The company has the following requirements:
• An existing phone number column must be formatted to only display numbers and periods.
• Three existing columns must be calculated to display the sum based on a percentage.
• The solution must not use custom development when possible.
You need to implement the business logic solution.
Which method should you use? To answer, move the appropriate solutions to the correct requirements. You may use each solution once, more than once, or not at all. You may need to move the split bar between panes or scroll to view content.
NOTE: Each correct selection is worth one point.
Question 34
A company has an application that provides API access. You plan to connect to the API from a canvas app by using a custom connector.
You need to request information from the API developers so that you can create the custom connector.
Which two types of files can you use? Each correct answer presents a complete solution.
NOTE: Each correct selection is worth one point.
- A: YAML
- B: WSDL
- C: OpenAPI definition
- D: Postman collection
Question 35
You are creating a FetchXML query.
The query must return data from a table and return filtered data from a related table.
You need to configure the FetchXML query.
Which two elements should you use? Each correct answer presents part of the solution.
NOTE: Each correct selection is worth one point.
- A: attribute
- B: link-entity
- C: alias
- D: condition
Question 36
You plan to create a canvas app to manage large sets of records. Users will filter and sort the data.
You must implement delegation in the canvas app to mitigate potential performance issues.
You need to recommend data sources for the app.
Which two data sources should you recommend? Each correct answer presents a complete solution.
NOTE: Each correct selection is worth one point.
- A: SQL Server
- B: Common Data Service
- C: Azure Data Factory
- D: Azure Table Storage
Question 37
HOTSPOT -
A client is deploying Dynamics 365 Finance without any third-party add-ons.
You need to select the appropriate solutions for the client.
What should you select? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.
Hot Area:
Question 38
DRAG DROP -
A company uses Microsoft 365. You are developing a model-driven app.
The app must meet the following requirements:
✑ Use SharePoint Online for document storage.
✑ Send emails by using Exchange Online.
You need to configure integrations.
What should you configure? To answer, drag the appropriate configuration options to the correct requirements. Each configuration option may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content.
NOTE: Each correct selection is worth one point.
Select and Place:
Question 39
A company plans to create an order processing app. When orders are created, the app will perform complex business logic and integrate with several external systems.
Orders that have a large number of line items may take up to six minutes to complete. Processing for each order must be completed in one operation to avoid leaving records in an incomplete state.
You need to recommend a solution for the company.
What should you recommend?
- A: an asynchronous workflow that uses a custom workflow activity
- B: a real-time workflow that uses a custom action
- C: a webhook that connects to an Azure Function
- D: an asynchronous plug-in
Question 40
HOTSPOT -
You work for a not-for-profit agency that manages business processes by using Power Platform custom entities.
Volunteer registration and onboarding are manual processes that include multiple related entities.
You need to implement a portal solution that replaces the manual processes.
Which modules should you use? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.
Hot Area:
Question 41
You need to modify the Power Automate flow to resolve CustomerC's issue.
What should you do?
- A: Add a configure run that is set to is successful.
- B: Add a data operation that specifies the false conditions.
- C: Add a condition containing approval hierarchy.
- D: Add a timeout setting to the approval flow.
Question 42
DRAG DROP -
You need to recommend solutions to meet the e-commerce automation requirements.
Which platform tools should you recommend? To answer, drag the appropriate tools to the correct requirements. Each tool may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content.
NOTE: Each correct selection is worth one point.
Select and Place:
Question 43
DRAG DROP -
You need to select a process to create each function.
Which process should you use? To answer, drag the appropriate processes to the correct functions. Each process may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content.
NOTE: Each correct selection is worth one point.
Select and Place:
Question 44
You need to create the model driven app for accounts designated as referrals.
What should you add to the app?
- A: Workflow
- B: Subgrid
- C: Business rule
- D: Flow
- E: Chart
Question 45
You need to handle errors in UpdateRecord.js.
Which code segment should you add at line UR04?
- A: catch(error) { alert("Caught error: " + error.message);}
- B: Exception exception = Server.GetLastError(); if(exception != null)
- C: Catch(exception e){ console.writeline(e)}
- D: function (error){ console.log(error.message)}
Question 46
You need to configure the system to support automation for referrals.
What are two possible ways to achieve the goal? Each correct selection presents a complete solution.
NOTE: Each correct selection is worth one point.
- A: Azure Function that uses the Discovery service
- B: workflow extension
- C: Azure Function that uses a listener
- D: Power Automate flow
Question 47
DRAG DROP -
You need to determine how to implement rules for players who register for a soccer tournament.
Which business rule actions should you use? To answer, drag the appropriate business rule actions to the correct fields. Each business rule action may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content.
NOTE: Each correct selection is worth one point.
Select and Place:
Question 48
You need to connect to the background check API.
Which mechanism should you use?
- A: JavaScript
- B: Flow with a custom connector
- C: Azure Function
- D: Plug-in
Question 49
DRAG DROP -
You need to address the user interface issues.
What should you do? To answer, drag the appropriate actions to the correct issues. Each action may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content.
NOTE: Each correct selection is worth one point.
Select and Place:
Question 50
You need to add the script for the registration form event handling.
Which code segment should you use?
- A: formContext.data.entity.addOnSave(myFunction)
- B: formContext.data.addOnLoad(myFunction)
- C: formContext.data.removeOnLoad(myFunction)
- D: addOnPreProcessStatusChange