MB-320Free trialFree trial

By microsoft
Aug, 2025

Verified

25Q per page

Question 1

DRAG DROP -
You are the production supervisor at a manufacturing company. You are in the process of configuring the production control module and its parameters.
A company plans to use manufacturing execution. Bill of materials (BOM) item consumption must be generated when items are reported at the operation level.
You need to configure the Manufacturing execution production order defaults form to allow for back flushing on operations.
How should you set up Automatic BOM consumption? To answer, drag the appropriate setting to the correct targets. Each source may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content.
NOTE: Each correct selection is worth one point.
Select and Place:

Image 1

Question 2

HOTSPOT -
A company manufactures high-end speaker systems. You have different configurations available for customers to customize features including finishes and speaker materials. You have a product configuration model with bill of material lines and conditions for each component.
A customer can optionally add on protective covers, but only if a non-metal material is selected. If any other material is selected, the covers cannot be added. You add the following attributes:

Image 1

You need to create an expression-based constraint that will only allow Corner Protection if Metal is not selected.
How should you complete the expression? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.
Hot Area:

Image 2

Question 3

DRAG DROP -
A manufacturer uses route operations and job scheduling.
You use a unique calendar for a conveyor line. The company observes a decrease in the number of hours a conveyor line resource is operational due to breakdowns. You must make a temporary change to the number of hours the resource is available.
You need to adjust the efficiency percentage for the conveyor line calendar.
Which three actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.
Select and Place:

Image 1

Question 4

A company produces paints and assembles bicycle frames.
You must account for paint drying time before assembly operations can begin. You need to set up the operation to encompass queue times.
Which two options can you use? Each correct answer presents part of solution.
NOTE: Each correct selection is worth one point.

  • A: Enter a value in the queue time after field for the painting operation
  • B: Make a resource group for each size and color and assign that group to the operation
  • C: Enter a value in the transit time on the painting operation
  • D: Enter a value in the queue time before field for the assembly operation
  • E: Build capabilities for each resource related to color

Question 5

DRAG DROP -
A company manufactures automobile engines.
You must create product configurations for values that are used in different types of engines. Each value is based on a master valve design. Different gaskets and fittings are used to allow valves to work with different engines.
You need to translate production plans into Dynamics 365 Finance and Operations elements.
Which four actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.
Select and Place:

Image 1

Question 6

You maintain responsible resource calendars and production orders for a manufacturing company. All production resources use the same production calendar.
A machine in the facility is defective and must be closed for repairs for the next two days.
You need to configure the resource calendar to close the resource for production for the next two days.
What should you do?

  • A: Navigate to the resource group. Change the calendar to closed on the resource group.
  • B: Navigate to the calendar used for production and close the next two days.
  • C: Navigate to the resource. Change the calendar to closed on the resource.
  • D: Navigate to the resource and select Calendar deviations. Set the calendar to closed for the next two days.

Question 7

A manufacturing company is implementing Dynamics 365 Supply Chain Management. The company uses a standard costing model to value inventory.
During the setup of the system, all areas that impact the standard cost of the item must be configured correctly to calculate a complete standard cost by using routing, Bill of materials (BOM) and overhead burden.
You need to verify that all areas of the system are correctly configured.
Which object does NOT impact the standard cost of manufactured items?

  • A: item group
  • B: cost groups
  • C: cost categories
  • D: BOM formula

Question 8

DRAG DROP -
A glass bottle manufacturer uses route operations to schedule resources and track manufacturing costs.
The company has recently seen an increase in demand and purchases another resource. The company uses the same costs per resource. However, the new resource costs more to run. The company must be able to track cost contributions for the new resource.
You need to create a cost category for the new resource.
Which three actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.
NOTE: Each correct selection is worth one point.
Select and Place:

Image 1

Question 9

DRAG DROP -
You are the product design manager for a computer manufacturer.
Your new laptop model is configurable. There are restrictions on which hardware components can be selected depending on the model. You create configuration groups for hardware and software.
You need to create a new laptop item number and configurations.
In which order should you perform the actions? To answer, move all actions from the list of actions to the answer area and arrange them in the correct order.
Select and Place:

Image 1

Question 10

A company is looking to use Dynamics 365 Supply Chain Management.
The company is in the process of redesigning and retooling an existing manufacturing plant to group similar, cellular operations to improve efficiency and minimize wasted time between operations. They want to locate raw materials close to where they are needed without losing reorder visibility.
You need to set up their environment.
Which kind of production type should you implement?

  • A: Lean manufacturing
  • B: Process manufacturing
  • C: Discrete manufacturing
  • D: Manufacturing execution

Question 11

A company is looking to use Dynamics 365 Supply Chain Management.
The company is in the process of redesigning and retooling an existing manufacturing plant to support a large long-running contract. They want to be able to forecast capacity to easily ramp up for additional products.
You need to set up the environment.
Which type of manufacturing should you implement?

  • A: Lean
  • B: Discrete
  • C: Job shop
  • D: Process

Question 12

DRAG DROP -
A skateboard manufacturer uses route operations to schedule resources and estimate units per hour. All products use the same sub assembly item and resource sanding process.
You observe an increase in the number of units a sanding belt resource can produce. The production schedule is now inaccurate due to the number of units the sanding belt line can produce.
You must make a permanent change to the number of units the resource can produce for all future orders.
You need to adjust the process quantity on the route operation.
Which three actions should you perform in sequence? To answer, move the appropriate actions form the list of actions to the answer area and arrange them in the correct order.
Select and Place:

Image 1

Question 13

DRAG DROP -
A company plans to implement Dynamics 365 Supply Chain Management.
You need to determine which manufacturing solutions to use.
Which manufacturing solution should you use? To answer, drag the appropriate setting to the correct drop targets. Each source may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content.
NOTE: Each correct selection is worth one point.
Select and Place:

Image 1

Question 14

A company produces generic and name-brand paper plates in the same factory using standard costing and using the same Bill of materials and routes to produce both products.
The finance and production teams want a way to view individual raw material consumption costs in the ledger.
You need to add a production group to control postings to the ledger.
What should you do?

  • A: Create a production group for the finished good item
  • B: Update the cost of the generic finished good item
  • C: Create a production pool for the finished good item
  • D: Create a new Bill of materials with alternate costs for the raw material

Question 15

HOTSPOT -
A company implements Dynamics 365 Supply Chain Management.
Production orders are generated for products directly from projects. You create the following production order:

Image 1

Use the drop-down menus to select the answer choice that answers each question based on the information presented in the graphic.
NOTE: Each correct selection is worth one point.
Hot Area:

Image 2

Question 16

HOTSPOT -
A customer produces light projection toys for holiday decorations throughout the year.
You must implement Bills of material (BOMs) for the product lifestyle. The solution must meet the following requirements:

Image 1

You need to create a BOM for each phase.
Which BOM types should you use? To answer, select the appropriate configuration options in the answer area.
NOTE: Each correct selection is worth one point.
Hot Area:

Image 2

Question 17

A manufacturing company uses advanced warehouse management functionality for a new warehouse.
After releasing a production order, you observe that the warehouse work for raw material picking was not generated.
You need to go through the warehouse management setup to determine what is missing.
What three setup configurations must you validate? Each correct answer presents part of the solution.
NOTE: Each correct selection is worth one point.

  • A: Work template for raw material picking
  • B: Wave template
  • C: Directive codes
  • D: Confirm the production output location on your resource group
  • E: Location directive for raw material picking

Question 18

DRAG DROP -
A company uses Dynamics 365 Supply Chain Management for Process manufacturing.
Employees spend considerable time cleaning and setting up machines in a specific area between production orders. You must group production activities to optimize cleaning and set up time.
You need to set up the system.
In which order should you perform the actions? To answer, move all actions from the list of actions to the answer area and arrange them in the correct order.
NOTE: Each correct selection is worth one point.
Select and Place:

Image 1

Question 19

DRAG DROP -
A company makes lubricants and greases used in the automotive industry. The company plans to implement Dynamics 365 Supply Chain Management.
The system must meet the following requirements:
✑ Schedule the batch production of products.
✑ Plan for inventory fluctuations of ingredients that are used across different products.
✑ Schedule delivery of amounts of proprietary compounds used during production from vendors to keep production runs on schedule and eliminating excess stock on hand or delayed production.
The company is starting the initial setup of their Dynamics 365 environment.
You need to perform the initial setup of the environment.
Where would you need to set up the following items? To answer, drag the appropriate setting to the correct drop targets. Each source may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content.
NOTE: Each correct selection is worth one point.
Select and Place:

Image 1

Question 20

A company makes lubricants and greases used in the automotive industry.
They are planning to use Dynamics 365 Supply Chain Management to make products whose characteristics can be tracked throughout the production process and are associated with the packaged product.
You need to identify which production methodology to use.
Which production methodology should you use?

  • A: Discrete manufacturing
  • B: Lean manufacturing
  • C: Process manufacturing
  • D: Job shop manufacturing

Question 21

DRAG DROP -
A company plans to account for indirect costs related to materials used to manufacture products.
The items used to manufacture products have surcharge rates that depend on the type of product being used.
You need to set up the costing sheet to include surcharges for specific items.
Which three actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.
Select and Place:

Image 1

Question 22

A company produces multiple products that require an installation kit that includes 50 components.
The company does not want to include these 50 components in every Bill of materials (BOM). You have a BOM kit that includes all 50 components, but you do not want it to produce a separate production order.
You need to set up the product BOM for the finished good.
What should you do?

  • A: Select Phantom on the engineering fast tab on the kit item
  • B: Change the coverage group on the kit item to Manual
  • C: Change the line type to Phantom
  • D: Change the line type to Pegged supply

Question 23

HOTSPOT -
A company implements Dynamics 365 Supply Chain Management. You must use functionality in the system for group production runs to prevent downtime and excessive cleaning of the machines on the production line.
You need to set up the system.
Which behaviors should you expect? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.
Hot Area:

Image 1

Question 24

DRAG DROP -
A company overstates on-hand raw materials due to the time it takes to post raw materials when production orders are processed.
All items used to manufacture finished goods must be consumed when a finished good is reported as finished. You must not change all bill of materials lines to use the option of flushing principal.
You need to ensure that all production orders consume raw materials at Report as finished.
Which four actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.
Select and Place:

Image 1

Question 25

HOTSPOT -
A company makes engine parts used in the automotive industry.
They are in the process of retooling an existing manufacturing plant. They are looking to use Dynamics 365 Supply Chain Management to help support the Bill of
Materials (BOM) product lifecycle for engineering version control.
You must translate existing production processes into the proper elements. You need to create BOM lifecycle states to translate existing production processes into the proper elements.
What type of BOM product lifecycle state should you create? To answer, select the appropriate BOM state in the answer area.
Hot Area:

Image 1
Page 1 of 8 • Questions 1-25 of 199

Free preview mode

Enjoy the free questions and consider upgrading to gain full access!