Loading questions...
Updated
Want a break from the ads?
Become a Supporter and enjoy a completely ad-free experience, plus unlock Learn Mode, Exam Mode, AstroTutor AI, and more.
Create a free account to unlock all questions for this exam.
Log In / Sign UpA consultant asks a customer to verify the ToR Switch data port configuration was done according to Nutanix best practices. The switch configuration must simplify future deployments and expansions.
Which two configuration actions will satisfy this requirement? (Choose two.)
After imaging the nodes and creating the cluster successfully in a sandbox environment, the consultant connects the cluster to the customer’s Production network. However, notices Prism Element Alerts Dashboard is displaying multiple errors.
What is causing this issue?
After an onsite cluster deployment, a consultant prepares the deliverables for a project closeout.
Which two data in the As-Built Guide require adjustment or might be missing completely? (Choose two.)
In preparing to install a new cluster for a company, a consultant needs to complete an installation worksheet.
Which values must be documented prior to initial base system setup?
The installation process stops before imaging any of the nodes and an error message is displayed notifying the IPMI IP address is unreachable.
What should consultant do to fix the issue?
During a Site Readiness Check, a customer informed the consultant that there is no NTP server currently configured in the environment.
Which two statements should the consultant consider for continuing the cluster deployment? (Choose two.)
Which subnet should a consultant be aware is reserved for internal connectivity within a Nutanix cluster?