VerifiedArchitect the solutionWaratah Hospital, located in Australia, plans to relocate many data-center services to a new facility. (The remaining legacy data center is outside the scope of this project.) Waratah Hospital has engaged an external consultant to help design the new data-center network.
Based on the data-center network-infrastructure requirements, the external consultant has produced a high-level design. The following summarizes the design document.
Requirements and information:
- Six racks in the data-center room (a single row).
- Redundant Top-of-Rack leaf switches with back-to-front cooling in every rack, delivering 10/25 Gbps connectivity for servers, storage, and other devices.
- Four 100 GbE uplinks per leaf switch.
- The customer requested that all switch ports face the back of the racks (hot aisle).
- OOB management for servers, storage, and networking must be delivered through an external switch with back-to-front cooling. This switch must be included in the solution. One OOB switch provides connectivity for two racks.
- Core equipment for the OOBM network is being reused.
- Middle-of-row spine switches.
- The data center must connect to the hospital building through links providing 400 Gbps.
- Internet access is supplied through an existing firewall cluster with two firewalls, with one firewall in each data room. The second firewall runs in standby mode, and VRRP is used on the firewalls for failover. The data-center network must connect to these firewalls using links totaling 100 Gbps.
- The external link is a dark-fiber direct link using single-mode fiber (OS2). The distance to the main hospital is 1.5 KM. The links will terminate on two core switches in the hospital.
The customer also requires:
- 99.999% uptime for this life-critical environment.
- Planned and unplanned downtime must be minimized.
- Software upgrades are permitted only once per year with close to zero downtime.
- All life-critical resources are accessed locally, and all resources reside within the hospital campus.
- Waratah Hospital requires a highly secure data-center environment. Encrypted wire-speed connectivity between the data room and the hospital is mandatory because the link between the buildings crosses a public road.
- Waratah Hospital has a mix of virtualized (vSphere) servers, Nutanix storage, bare-metal servers, backup servers, and other devices.
Previously, the hospital experienced a security breach that caused data loss, network downtime, and identity theft.
In this scenario, the customer servers are HPE Servers. For the iLO ports, you propose one 6300M switch per rack. What is the best practice for connecting these switches to the data-center data plane?