VerifiedSwitching‘Don't Buy at Us’ is a US-based retail company expanding into Europe. Its EMEA expansion includes a regional headquarters, HQ2, in The Netherlands.
Its US-based headquarters, HQ1, was refreshed last year using the HPE Aruba Networking ESP architecture. You created the HQ2 design using the same two-tier design as HQ1. The high-level design is shown below.

Switch BOM for this project based on Two Tier:
- Collapsed Core: 2 x 8360-16Y2C in VSX (ISL 2x100GbE DAC)
- Access Stack: 10 x Stack of 6200F 48G Class4 PoE 4SFP+ 740W (each stack has 4 members, VSF with 10GbE VSF links) (2 x 10GbE uplink per stack)
During the presentation of your design to the CTO of ‘Don't Buy at Us’, you were informed of the changes they want incorporated into the updated design.
- HQ2 will include the EMEA regional distribution center (EMEA-DISTR) next to HQ2.
- Only two pairs of OS1 are available between HQ2 and EMEA-DISTR.
- The uplinks from all access stacks must increase to 2 x 25GbE; the fiber in HQ2 and EMEA-DISTRI is certified for 25GbE.
- EMEA-DISTR requires at least 7 x stack of Aruba 48 ports switches (each stack has 4 members).