QuestionQ74
VerifiedFoundation and Cluster DeploymentRefer to the exhibit.

A Foundation installation must be performed on four NX nodes for a new customer. A consultant needs to configure the onsite network before imaging the nodes with the Foundation tool.
The nodes have two dual-port SFP28 25GbE NICs and a dual-port 10GBase-T NIC. The customer’s ToR switches are 25GbE datacenter switches that are already in production.
What hardware is appropriate to perform the most reliable imaging of these NX nodes?