QuestionQ54Verified/Basics of network management systemCopy linkReport a problemAsk AstroTutorSave questionWhen should the Run Design task be triggered to validate the current design?ARun design is not necessary to validate the current design.BOnly when a new optical transponder (OT) needs to be added in the design.CRun design task is triggered automatically during the commissioning file creation.DEvery time a change has been introduced in the current design.Show AnswerAnswerExplanationRunning the design task after each design modification ensures that calculations, dependencies, and validation results reflect the current network design. A change is not restricted to adding an optical transponder, and commissioning-file creation does not replace revalidation of all design changes.Show comments0Show commentsCommunity DiscussionNo comments yet. Be the first to start the discussion!
Community Discussion