QuestionQ74

VerifiedONTAP SAN implementation testing and troubleshooting

A storage engineer for a 4-node cluster observes that nodes 1 and 2 are both operating at 90% capacity. The engineer intends to migrate LUNs with Selective LUN Mapping (SLM) enabled from node 1 to node 4.

What must be done after the migration?

Explanation

SLM uses reporting nodes to advertise host paths to a mapped LUN. Following a LUN data-mobility event, the reporting-nodes list must be updated to remove no-longer-needed source nodes and retain the destination owner and its HA partner, ensuring that hosts use optimized paths.