QuestionQ36
Intermediate System to Intermediate System (IS-IS)Refer to the exhibit.

R1 and R2 are configured to run IS-IS, and the IS-IS adjacency between R1 and R2 is up.
What does the show isis interface command output indicate about R1?
- A R1 advertises a Level 1 metric of 100 and a Level 2 metric of 100 toward R2 in its link-state PDU
- B R1 only forms a Level 2 adjacency with R2.
- C R1 sends Level 1 hello PDUs to R2.
- D R1 is not configured to use wide metrics.
Community Discussion