VerifiedChapter 4: Test Analysis and DesignConsider these examples of risks identified across different software development projects:
[I]. The expected workloads may be impossible to generate for performance testing because the machines (load injectors) intended to produce those workloads have inadequate hardware equipment.
[II]. A web-application user session is not invalidated after the user has been inactive for a certain period, as configured by the system administrator.
[III]. By the time test design and analysis activities are scheduled to start under the test plan, the test team will not have an adequate requirements specification because many requirements will still be missing.
[IV]. After a failure, the system cannot continue to maintain its pre-failure operation, and some data is corrupted.
Which of the following statements is TRUE?