QuestionQ59
VerifiedContinuous ImprovementThe functional-regression test automation suite ran successfully during the first two sprints, with no failures encountered in its runs. The automation suite records every test case as either ‘pass’ or ‘fail’ and includes excellent recovery capability.
In the third sprint, the TAS log reported several test cases as ‘fail’. You investigated every test case and determined that most failures resulted from a defect in a keyword script rather than in the SUT. For cases in which the failure was in the SUT, defect reports were raised, but developers returned several of them requesting more information to reproduce the problem.
Which additional TAS log items SHOULD be added to BEST improve failure analysis and defect reporting in future sprints?
- a. Dynamic measurement information about the SUT.
- b. A ‘TAS error’ status, in addition to ‘pass’ and ‘fail’, for each test case.
- c. A colour-coding scheme in which ‘pass’ is red and ‘fail’ is green.
- d. A counter that determines how many times each test case has run.
- e. System-configuration information, including software/firmware and operating-system versions.
- f. A copy of the source code for every executed Keyword script.
Community Discussion