QuestionQ47Verified/NG WDM Equipment Routine MaintenanceCopy linkReport a problemAsk AstroTutorSave questionWhich of the following statements concerning SCC board replacement is incorrect?AIn the case of the 1+1 hot backup of the SCC board, replacing the control board does not affect services when the active/standby switchover is performed.BAfter the SCC board is removed, the BD_STATUS and COMMUN_FAIL alarms are reported. After the new board goes online, these alarms need to be manually cleared.CIf the software version of the new SCC board is later than equipment version, clear the database of the SCC board, and then downgrade the software on the SCC board to the same version as the equipment.DIf the software version of the new SCC board is earlier than the equipment version, upgrade the software on the SCC board to the same version as the equipment.Show AnswerAnswerExplanationBD_STATUS and COMMUN_FAIL alarms caused by removal of a board are expected to clear when the replacement board is installed and operating normally; they are not alarms that must be manually cleared. Huawei troubleshooting procedures direct operators to check whether these alarms clear after board replacement.Learn moreHuawei: Checking Whether the Alarm Parameter Is 0x01 0x00 0x03 and a Board Reports the COMMUN_FAIL AlarmShow comments0Show commentsCommunity DiscussionNo comments yet. Be the first to start the discussion!
Community Discussion