QuestionQ68

VerifiedArchitect the solution

The customer runs a 24/7 production facility and is concerned that the migration could interrupt the production line.

Which two approaches can minimize or eliminate this disruption?

Choose two
Explanation

A parallel network migration permits the new infrastructure to be brought online alongside the existing network and enables a controlled cutover with a straightforward rollback path. Migrating one access switch at a time with a defined patch plan limits disruption to a small, controlled set of connected endpoints rather than interrupting the entire facility. Cisco guidance identifies parallel installation and one-switch-at-a-time migration as approaches that reduce migration impact.