QuestionQ5

VerifiedAnalyze requirements

Waratah Hospital, located in Australia, plans to move many data-center services to a new facility. (The remaining legacy data center is outside the scope of this project.) Waratah Hospital has engaged an external consultant to help design the new data-center network.

Based on the data-center network-infrastructure requirements, the external consultant has produced a high-level design. The design document is summarized below.

Requirements and information:

  • Six racks in the data-center room (a single row).
  • Redundant top-of-rack leaf switches with back-to-front cooling in each rack, delivering 10/25 Gbps connectivity to servers, storage, and other devices.
  • Four 100 GbE uplinks per leaf switch.
  • The customer requested that all switch ports face the rear of the racks (the hot aisle).
  • OOB management for servers, storage, and the network must be provided through an external switch with back-to-front cooling. This switch must be included in the solution. One OOB switch provides connectivity for two racks.
  • Core equipment for the OOBM network is being reused.
  • Middle-of-row spine switches.
  • The data center must connect to the hospital building with links providing 400 Gbps.
  • Internet access is supplied through an existing firewall cluster with two firewalls, with one firewall in each data room. The second firewall operates in standby mode, and VRRP is used for firewall failover. The data-center network must connect to these firewalls with links totaling 100 Gbps.
  • The external link is a dark-fiber direct link based on single-mode fiber (OS2). The distance to the main hospital is 1.5 KM. The links will terminate on two core switches in the hospital.

The customer also requires:

  • 99.999% uptime for this life-critical environment.
  • Planned and unplanned downtime must be minimized.
  • Software upgrades are permitted only once per year with close to zero downtime.
  • All life-critical resources are accessed locally, and all resources exist within the hospital campus.
  • Waratah Hospital requires a highly secure data-center environment. Encrypted wire-speed connectivity between the data room and the hospital is mandatory because the link between the buildings crosses a public road.
  • Waratah Hospital has a mix of virtualized (vSphere) servers, Nutanix storage, bare-metal servers, backup servers, and other devices.

In the past, the hospital experienced a security breach that caused data loss, network downtime, and identity theft.

Given the scenario, what environmental information should be gathered to supplement the design?

Choose two
Explanation

Power requirements are needed to size and validate the facility’s electrical supply, redundant power paths, and power distribution for the proposed equipment. Heat-dissipation requirements are needed to size cooling and maintain acceptable intake temperatures and airflow. Cisco hardware documentation treats both maximum power provisioning and heat dissipation as installation-planning inputs; inadequate airflow or excess ambient temperature can cause thermal alarms or shutdowns.

Learn more

Community Discussion

No comments yet. Be the first to start the discussion!