QuestionQ20
Architect the solutionSeveral years ago, you delivered an L3 spine-and-leaf topology to a customer. The solution used two CX 8325-32C switches as spines and 20 CX 8325-48Y8C leaf switches. The leaf switches operate as 10 VSX pairs.
The customer now wants to double the topology’s forwarding capacity. What should you recommend?
- A Add two more 100GbE links between each leaf switch and spine switch
- B Upgrading the existing links to 200 GbE
- C Adding one more spine switch that connects to each leaf switch with two 100 GbE links
- D Adding two more spine switches that connect to each leaf switches with 100 GbE links