A network technician installed two 9240 mobility gateways in one cluster, which will terminate 1700 APs at a medium-sized branch office. The technician then connected the gateways using two SFP28 Direct Attach Copper (DAC) cables, split across a two-member core-switch stack, and powered them on.
What must the network administrator configure next on the gateways to ensure maximum wired-bandwidth utilization?
Community Discussion
No comments yet. Be the first to start the discussion!
Community Discussion