QuestionQ30
VerifiedNetwork Resiliency and virtualizationRefer to the exhibit.

A VSX cluster has already been configured. You must validate the correct configuration for the Edge-1 switch, which connects to a CCTV provider that will install its switching infrastructure. The CCTV switches do not support STP.
What must be configured on the Edge-1 switch ports connected to CCTV-SW1 and CCTV-SW2 to prevent loop issues in the existing setup while providing automatic recovery?
Community Discussion