QuestionQ78

VerifiedNetwork Resiliency and virtualization

A manufacturing customer runs a 24/7 production facility and is concerned that the migration could disrupt the production chain.

What are two ways to minimize or eliminate this disruption?

Choose two
Explanation

Replacing one access switch at a time using a documented patch plan confines any interruption to a small, controlled set of connected devices. Running the new infrastructure in parallel permits validation before a transparent cutover and retains the old environment as a fallback. Migration sequencing should normally proceed from the core through distribution to the access layer; an access-layer-first sequence does not provide the required upstream infrastructure. Cisco: Multiple Spanning Tree Migration Best Practices