QuestionQ59

VerifiedWLAN

A large multinational financial institution has hired you to design a new full-stack wired and wireless network for its new 6-story regional office building. The bottom two floors of the facility will be retail space for a large banking branch. The upper floors will be carpeted corporate office space, with each floor approximately 100,000 sq ft (9290 sq m). Data centers are all offsite and are out of scope for this project. The customer is underserved by its existing L2-based network infrastructure and wants to take advantage of modern best practices in the new design. The network must be fully resilient and fault-tolerant, with dynamic segmentation at the edge.

The retail space will provide public guest Wi-Fi access. Retail associates will use corporate tablets for customer service, and the retail floors will contain a mix of wired and wireless devices. Corporate users will primarily connect wirelessly, but several wired clients, printers, and hard VoIP phones will also be used.

The customer also plans to renovate the corporate office space to take advantage of ‘smart office’ technology. These improvements will enable blue-dot wayfinding, presence analytics, and other location-based services.

The client has supplied floorplans, wall density, and ceiling heights for the wireless deployment in the carpeted office space.

What additional information is needed to write an accurate bill of materials?

Choose two
Explanation

PoE port requirements determine the switch port count and power budget needed to support access points, VoIP phones, and other powered edge devices. Ceiling construction determines the compatible access-point mounting method and any required brackets or additional mounting hardware; Cisco documentation distinguishes suspended-ceiling and hard-surface mounting and notes that above-ceiling installations can require additional hardware.