QuestionQ15

VerifiedSystem Pre-Installation and Installation

A customer intends to upgrade a diskless VSP 5100 to a VSP 5500.

Which three component types are added during the upgrade?

Choose three
Explanation

Upgrading a diskless VSP 5100 to a VSP 5500 expands the controller architecture, requiring additional Controllers (CTLs), Channel Boards (CHBs), and Interconnect Switches (ISWs). The existing Hitachi Interconnect Edges (HIEs) and Hitachi Service and Network Boxes (HSNBXs) are retained rather than added.

Community Discussion

No comments yet. Be the first to start the discussion!