QuestionQ50

Business Continuity

An architect is configuring BCSD to design SRDF/S between two new PowerMax arrays. The architect has finished the local-side tasks, including the RA Port Group, Replication Group, and site switch.

What is the correct sequence of steps needed to complete the SRDF setup?

Drag & Drop
Create remote Replication Group
Create remote array
Configure network circuit
Create remote RA Port Group
Configure remote site switch
STEP 1
STEP 2
STEP 3
STEP 4
STEP 5
Explanation

A remote replication group depends on a remote RA port group, which in turn belongs to an existing remote array. The site switch is then configured to provide the remote-side connectivity, and the network circuit is configured last to connect the completed local and remote switches.