QuestionQ16
PowerMax Upgrades and MigrationsRemote Proactive has placed a CE Lock on a PowerMax 2000 frame in preparation for a bin-file change that adds I/O Modules and RF ports to an existing system.
While the CE Lock remains in place, which configurations can be made on the frame?
- A Changes can be made by releasing the CE lock without impacting the planned bin load.
- B All provisioning operations are allowed with the lock in place.
- C All provisioning operations are blocked with the lock in place.
- D Creating and deleting new TDEVs is blocked, but masking operations are allowed.
Community Discussion