QuestionQ16

PowerMax Upgrades and Migrations

Remote Proactive has placed a CE Lock on a PowerMax 2000 frame in preparation for a bin-file change that adds I/O Modules and RF ports to an existing system.

While the CE Lock remains in place, which configurations can be made on the frame?

  • A Changes can be made by releasing the CE lock without impacting the planned bin load.
  • B All provisioning operations are allowed with the lock in place.
  • C All provisioning operations are blocked with the lock in place.
  • D Creating and deleting new TDEVs is blocked, but masking operations are allowed.
Explanation

A CE Lock protects the PowerMax configuration during planned service activity by blocking provisioning operations. This prevents changes such as device provisioning and masking modifications from altering the frame configuration while the bin-file change is pending.