QuestionQ15
PowerMax Upgrades and MigrationsBecause of data-center space restrictions for the PowerMax 8500 system, the existing six node pairs with four DMEs are limited to expansion within the current rack.
What is a valid upgrade option in this scenario?
- A One more DME (total five) can be installed in the existing rack.
- B Two more DME (total six) can be installed in the existing rack.
- C No additional node pairs or DME can be added to this configuration.
- D Two more node pairs (eight node pairs) can be installed in the existing rack.
Community Discussion