QuestionQ32
VerifiedExternal Network Connectivity
Refer to the exhibit. The Cisco ACI fabric has an egress L3Out from Leaf-101 and Leaf-102 to CORE-1. VLAN 102 forms the OSPF adjacency. The workloads must be migrated into EPG-101, and the static port binding is configured on Leaf-103 e1/1 with encapsulation VLAN 101. An engineer completes the port binding and receives an MCP fault. Which action clears the fault?
Community Discussion