QuestionQ59
VerifiedNetwork Access
Refer to the exhibit.
PC1 regularly sends 1800 Mbps of traffic to the server. A network engineer must configure the EtherChannel so that Port Channel 1 between SW1 and SW2 is disabled when the Ge0/0 and Ge0/1 interfaces on SW2 go down.
Which configuration must the engineer apply to the switch?
Community Discussion