QuestionQ39

VerifiedPlatform Knowledge

What is the process behavior at design time when the ValidateUnconnectedNodes property is set to True on a flowchart and a Log Message activity in that flowchart is not connected to any other node?

Explanation

When the flowchart's ValidateUnconnectedNodes property is set to True, Studio checks at design time whether any activities are left unconnected and displays a validation error indicating that some activities are not connected to the others in the flowchart. This surfaces the problem immediately during design rather than deferring to runtime, so option B (silent validation with a runtime exception) is wrong; the check is native to Studio validation, not limited to the Workflow Analyzer (option C), and it produces an error, not merely an Output-panel warning (option D). The existing key of B is therefore incorrect.

Learn more

Community Discussion

No comments yet. Be the first to start the discussion!