QuestionQ28

VerifiedWLAN Planning and Design

Differentiated network planning must be performed to meet the requirements of different IoT services in Huawei CloudCampus IoT solutions. Match each solution on the left with its corresponding network-planning recommendation on the right.

Drag & Drop
Shelves may be blocked in application scenarios. Therefore, shelf blocking must be considered during network planning. The shelves can be deployed in aisles to minimize obstacles toward integrated base stations.
The RFID signal coverage distance is 25m. Therefore, RFID signal coverage must be considered during AP deployment planning. Attach RFID tags on the surface or top of assets to prevent signals from being blocked.
For applications that support regional positioning, positioning devices need to be deployed at key entrances and exits based on service requirements.
Explanation

Asset management relies on RFID tags, so AP placement and unobstructed RFID-tag coverage are required. ESL deployments must account for signal obstruction from shelves and benefit from aisle placement. Smart healthcare regional-positioning services require positioning devices at relevant entrances and exits.

Community Discussion

No comments yet. Be the first to start the discussion!