QuestionQ2Verified/System maintenanceCopy linkReport a problemAsk AstroTutorSave questionYou must replace a failed power supply (PS) in a VSP E590. What is the proper procedure?ACheck if the status of the PS is blocked, and if yes, then replace it directly.BUse the Maintenance Utility for blocking the PS, then replace it.CUse the Maintenance Utility for blocking the controller, then replace the PS.DUse the MPC for blocking the PS, then replace it.Show AnswerAnswerExplanationBefore replacing a VSP E590 power supply, block that power supply by using the Maintenance Utility, then perform the replacement. Blocking records the component’s maintenance state and permits its safe service; blocking the controller is not required for a power-supply replacement.Learn moreUsing Maintenance Utility window — Audit Log User Guide for VSP E SeriesComponent status in the REST API Reference GuideShow comments1Show commentsCommunity DiscussionNo comments yet. Be the first to start the discussion!
Community Discussion