QuestionQ31
VerifiedConsider the following DAG:
model_a model_c model_e model_b model_d model_f
Both model_c and model_d feed into the final layer.
You run:
dbt run --fail-fast
in production with 2 threads. During the run, model_b and model_c are running in parallel when model_b returns an error.
Assume there are no other errors in the model files and that model_c was still running when model_b failed.
Which model or models will successfully build as part of this dbt run? Choose 1 option.
Community Discussion