QuestionQ173
Storage NetworkAn engineer must deploy FCoE on Cisco Nexus 9000 Series Switch-based infrastructure. The deployment will include dual-homed fabric extenders and must support jumbo frames using port channels. Which two sets of actions complete the configuration?
Choose two
- A Create a virtual Fibre Channel Interface. Bind vFC to physical interface.
- B Configure the interface with mtu 9516. Disable the feature NPIV.
- C Create a dedicated VSAN for FEX. Bind VSAN to FEX uplinks.
- D Execute fcoe enable-fex. Configure FEX uplinks with mtu 9216.
- E Create a FCoE switch profile. Enable config sync.
Community Discussion