QuestionQ27

VerifiedAI Infrastructure Operations and Troubleshooting

A Cisco UCS C885A M8 server has a GPU sled configured with six power supply units (PSUs) in an N+2 redundancy configuration. The GPU-sled workload is currently drawing 4500W. Using Power Save Mode, how many PSUs can be put into standby mode to increase power efficiency without compromising redundancy?

Explanation

The GPU sled uses six 3000W PSUs in a 4+2 (N+2) redundant arrangement. A 4500W load needs two 3000W PSUs for nonredundant capacity; retaining two additional PSUs preserves N+2 redundancy, leaving four active PSUs. Therefore, two of the six PSUs may be in standby mode.

Learn more

Community Discussion

No comments yet. Be the first to start the discussion!