VerifiedUnknown / not found in official Broadcom sourcesA sovereign cloud provider operates a VMware Cloud Foundation (VCF) stretched Workload Domain across two data centers, AZ1 and AZ2, with Layer 3 underlay connectivity between the sites.
The NSX design includes the following details:
- Each site must run its own local NSX Edge Cluster for availability zones.
- Tier-0 gateways must use active/active mode with BGP ECMP to local top-of-rack switches.
- Inter-site Edge TEP traffic must not traverse the inter-DC link.
- SDDC Manager automates NSX deployment.
While deploying the Edge Cluster for AZ2, the SDDC Manager workflow fails because the Edge transport-node TEP IP addresses cannot be reached from the ESX transport nodes.
Which step ensures the Edge Cluster is deployed correctly in multi-site stretched domains?