QuestionQ22
VerifiedSolution Design & ArchitectureA managed agent deployment for claims triage has expanded from 6 tools to 34 tools over 18 months as product teams added capabilities. Triage accuracy has declined from 91 percent to 78 percent, and average tool-selection latency has risen by 2.3 seconds. A junior engineer has proposed placing a tool-router agent in front of the existing agent to filter the tool list for each request.
Which two findings should you present to support capability decomposition before adding the router? Each correct answer represents part of the solution. (Select two.)
Choose two
Community Discussion