QuestionQ27

Workflow Integration and Solution Design

You are organizing connected data sources for a team and must finish the planning steps before authorizing a connection. Which two planning steps must be completed BEFORE authorizing a new Connector?

Each correct answer represents part of the solution.

Choose two
Explanation

Authorizing a connector requires governance validation: the connector must be approved by IT, and the data source’s classification and the team’s permission to use it must be confirmed. These checks establish vendor and data-access compliance before a connection is authorized.